房建工程造价动态管理中的信息化应用问题与优化路径探讨
袁思崇
作者信息
- 新东港控股集团有限公司 山东 日照 276800
摘要
为解决房建工程造价动态管理中信息化应用薄弱、数据分散难共享以及控制链条衔接不畅等问题,本文围绕全过程造价控制开展研究,重点梳理前期成本策划、设计阶段限额控制、施工阶段成本监控与合同及变更管理的现状与不足。研究指出,多系统并行导致数据口径不统一、信息传递滞后、过程留痕不足,容易出现成本偏差发现不及时、纠偏措施难落地、结算争议增多等情况。针对上述问题,本文提出以信息平台为纽带的优化思路:完善前期成本策划的系统化输出,推动限额设计与BIM数据联动校核,建设实时成本监控与预警机制,强化合同条款、变更签证与台账资料的数字化管理,并通过统一数据标准与共享平台打通各阶段数据链,形成可追溯、可对比、可闭环的动态控制体系,为造价管理人员实施动态管控提供可操作的参考。
Discussion on Issues and Optimization Paths of Information Technology Application in Dynamic Cost Management of Building Construction Projects
Si-chong Yuan
Author Information
- Xindonggang Holding Group Co., Ltd., Rizhao 276800, Shandong Province, China
Abstract
To address issues such as weak information technology application, fragmented and difficult-to-share data, and disconnected control chains in the dynamic cost management of building construction projects, this study focuses on whole-process cost control, particularly analyzing the current status and shortcomings of preliminary cost planning, design-phase cost limitation control, construction-phase cost monitoring, and contract and change management. The study points out that the parallel operation of multiple systems leads to inconsistent data standards, delayed information transmission, and insufficient process documentation, resulting in untimely detection of cost deviations, difficulties in implementing corrective measures, and increased settlement disputes. To address these issues, this paper proposes an optimization strategy centered on an information platform: improving the systematic output of preliminary cost planning, promoting the integration of design limitation control with BIM data for verification, establishing a real-time cost monitoring and early warning mechanism, strengthening the digital management of contract terms, change orders, and ledger records, and forming a traceable, comparable, and closed-loop dynamic control system by unifying data standards and establishing a shared platform to integrate data across all stages. This provides practical guidance for cost management personnel in implementing dynamic control.
