全过程造价管理视角下装饰工程概算偏差控制策略探析
冯宝莹
作者信息
- 中国联合工程有限公司 浙江 杭州 310000
摘要
装饰工程是建筑工程收尾和品质提升的关键部分,其概算编制的准确性,直接影响工程项目投资控制效果以及整体建设效益。传统静态、阶段性造价控制方式已经不能适应装饰工程工序复杂、材料种类繁多、工艺更新迅速的特点,很容易出现概算偏差,造成投资失控、工期调整、施工变更等工程隐患。全过程造价管理以工程全生命周期动态管控为核心,打破了传统造价管理分段割裂、事后补救的管控局限,可以从源头上规范装饰工程概算编制、审核和落地的全流程。
Exploration of Strategies for Controlling Budget Estimate Deviations in Decoration Engineering from the Perspective of Whole-Process Cost Management
Baoying Feng
Author Information
- China United Engineering Corporation Limited, Hangzhou 310000, Zhejiang Province, China
Abstract
Decoration engineering is a key part of the final stage and quality improvement of construction projects, and the accuracy of its budget estimate preparation directly affects the effectiveness of project investment control and overall construction benefits. Traditional static and phased cost control methods can no longer adapt to the characteristics of decoration engineering, such as complex processes, a wide variety of materials, and rapid process updates, and are prone to budget estimate deviations, resulting in engineering hazards such as investment loss of control, schedule adjustments, and construction changes.Whole-process cost management, with dynamic control throughout the entire project life cycle as its core, breaks the control limitations of traditional cost management, which is segmented and relies on after-the-fact remediation, and can regulate the entire process of budget estimate preparation, review, and implementation for decoration engineering from the source.
